← Back to Project Prep Report
Woman discussing home improvement plans with a contractor in front of a house
HouseFixher.com

Simple Home Repair & Improvement Help for Women

Sample Report

Sample Home Project Prep Report

This sample shows the kind of practical, plain-language preparation a personalized HouseFixHer report can provide before you talk to a contractor or approve a quote.

Home Project Prep Report $19.95 CAD / $14.95 USD · One-time download · No subscription

Sample Project Snapshot

Project Type Bathroom improvement
Area of Home Main bathroom
Timeline Within the next 1–2 months
Budget Range $5,000–$8,000

Sample Project Description

The homeowner wants to replace an older bathtub with a walk-in shower. She has one quote from a contractor but is unsure whether the quote includes plumbing changes, waterproofing, ventilation, permits, cleanup, and warranty details.

How to use this report Use this report as a pause point before saying yes. It helps organize your questions, clarify what should be in writing, and spot areas where the quote may need more detail.

What This Project May Involve

A tub-to-shower conversion can involve demolition, plumbing adjustments, wall repair, waterproofing, shower base installation, tile or wall panels, fixtures, ventilation, permits or inspections depending on local rules, cleanup, and disposal.

Important Things to Clarify

  • Is the old tub removal included?
  • Are plumbing changes included or billed separately?
  • What waterproofing system will be used behind the shower walls?
  • Are wall panels, tile, grout, fixtures, doors, and trim included?
  • Is ventilation being checked or upgraded?
  • Who handles cleanup and disposal?
  • What warranty covers the materials and the installation?

Questions to Ask the Contractor

  • Can you walk me through what is included from start to finish?
  • What could cause the price to increase after work begins?
  • If hidden water damage is found, how will that be handled and priced?
  • Will any licensed plumbing work be required?
  • Do permits or inspections apply to this project in my area?
  • How long will the bathroom be unusable?
  • What payment schedule do you require?

What Should Be in Writing

  • Detailed scope of work
  • Materials, brands, finishes, fixtures, and allowances
  • Plumbing work included or excluded
  • Waterproofing method
  • Start date and estimated timeline
  • Deposit and payment schedule
  • How changes or extra costs are approved
  • Cleanup, disposal, and warranty details
Red Flags to Slow Down For
  • The quote says “bathroom shower install” but does not list materials or scope.
  • The contractor asks for a large deposit before the details are clear.
  • Waterproofing is not explained.
  • Plumbing, permits, or inspections are brushed off without explanation.
  • You are told to decide quickly or risk losing the price.

Before You Say Yes Checklist

  • I understand what is included in the quote.
  • I know what is not included and could cost extra.
  • I asked about plumbing, waterproofing, ventilation, permits, and inspections.
  • I understand the deposit and payment schedule.
  • I know what warranty is included.
  • I have the quote and important details in writing.
  • I feel calm enough to decide, or I am choosing to pause and ask more questions.
Why this report helps

The goal is not to turn you into a contractor. The goal is to help you feel prepared, ask better questions, and avoid being rushed into unclear work, vague quotes, or payment decisions you do not fully understand.

What a Personalized Report Adds

A real HouseFixHer report is built from your own project details, quote notes, concerns, timeline, budget range, and questions. This sample is only an example.

Get My Home Project Prep Report Read Before You Hire Back to Home

Educational information only. HouseFixHer does not replace qualified professionals, inspections, permits, building codes, safety advice, legal advice, insurance advice, or contractor judgment.